One engineer from inspection to filing
Your site visit, measurements, drawings and submission stay with the same professional.
For Airbnb hosts & property managers
Electrical safety inspections, YDE certificates and digital filing with HEDNO/ΔΕΔΔΗΕ. Speak directly with the English-speaking engineer who handles your property.
We speak English. Greek paperwork, clearly explained.
Your site visit, measurements, drawings and submission stay with the same professional.
We explain any faults in English and agree the cost of repairs with you beforehand.
We arrange the site visit with your property manager or local contact.
Send the area, number of apartments and your deadline.
The engineer visits, takes measurements and explains the findings.
After any necessary repairs, we provide the drawings and submit the YDE digitally.
Property size, the number of panels and supplies, existing drawings and the condition of the installation. Ask for one quote if you manage several apartments. Any repairs are quoted separately before work starts.
Completed project · 4 apartments
Koukaki & Syntagma
Comprehensive loop testing, insulation measurements, emergency lighting, and official YDE certificate digital filing with DEDDIE for 4 residential rental apartments.
Tell us where the property is and what you need. Your engineer will contact you to discuss the inspection and quote.
Athens & Attica · English / Greek
YDE is the Greek electrical installation certificate (Υπεύθυνη Δήλωση Εγκαταστάτη), filed with HEDNO, the electricity distribution operator known in Greek as ΔΕΔΔΗΕ or DEDDIE. It documents the installation inspection, measurements and drawings.
Yes. Your engineer speaks fluent English and explains the documents, inspection results and next steps directly. We work with local and overseas property owners.
Yes, provided access to the property and electrical panel is arranged. We can coordinate with your property manager or another contact you nominate.
Target filing time: 24–48 hours after a successful inspection, any necessary repairs and receipt of the required documents. We confirm the timing for your property individually.
We explain the findings and quote necessary work separately. Filing proceeds after the required repairs and checks have been completed.
Yes. Send the number of properties and their areas so we can plan visits and provide a combined quote. Our completed work includes inspection and YDE filing for four apartments in Koukaki and Syntagma.
Athens and Attica, including the centre, northern, southern, eastern and western suburbs, and Piraeus. We agree the date and time of the visit with you.
If the inspection finds a fault with protection or wiring, the same engineer can carry out repairs under a separate, agreed quote.
Electrical panel upgrades